Bathroom renovations
done right behind the tile.

Comfort, careful waterproofing and everyday function. Tell us about your bathroom and get a free, no-obligation estimate.

Get a free estimate

START YOUR PROJECT WITH RELYRENO

Get your free estimate

Five quick details and we’ll follow up. Add more if you like.

Add project details (optional)

Free, no-obligation estimate. We only use these details to evaluate and respond to your inquiry.

WHAT’S INVOLVED

What a bathroom renovation can include

Showers and tubs

New tubs, walk-in showers and tub-to-shower conversions, planned around your drain and floor.

Waterproofing and tile

The layers behind and under the tile that keep water where it belongs, finished in the tile you choose.

Vanities and storage

Vanities, medicine cabinets and niches sized for the room and the people using it.

Fixtures and fittings

Toilets, faucets, shower valves and accessories selected to work together.

Ventilation and lighting

Exhaust fans that actually clear moisture, plus lighting at the mirror and overhead.

Accessibility-minded updates

Grab-bar blocking, lower thresholds and layouts that stay comfortable as needs change.

BEFORE YOU START

Plan it
properly.

A few decisions made early tend to save time, money and rework later.

  1. 01

    Waterproofing matters most.

    Tile and grout aren’t waterproof on their own. What goes behind them decides how a shower holds up over time.

  2. 02

    Choose fixtures before rough-in.

    Shower valves, drains and wall-hung pieces need the right connections in the wall before it’s closed up.

  3. 03

    Don’t skip ventilation.

    A properly sized fan vented outdoors protects paint, grout and framing from moisture.

  4. 04

    Plan around a shared bathroom.

    If it’s your only bathroom, think about timing and alternatives while it’s out of service.

COMMON QUESTIONS

Good to know.

Can a tub be replaced with a walk-in shower?

Often, yes. It depends on where the drain is, the floor structure and how the shower floor will be sloped. We’ll look at those details when we discuss your project.

How long does a bathroom renovation take?

A like-for-like update is quicker than a full gut with new plumbing locations. Fixture and tile availability also affects timing. We’ll give you a clearer picture once we know the scope.

Do I need a permit to renovate a bathroom?

Replacing fixtures and finishes usually doesn’t require one. Adding a new bathroom or changing drain and vent piping may. Check with your local building department, since rules vary across the GTA.

READY WHEN YOU ARE

Tell us what
you’re planning.

Share a few details and we’ll follow up to talk through your project and the next steps.

Get a free estimate
Get a free estimate